EN ISO11997-1循環(huán)腐蝕試驗(yàn)標(biāo)準(zhǔn)(鹽霧、干燥、潮濕)

時(shí)間:2018/11/24閱讀:8104
分享:

undefined
 

L24

L7
 

 

                                                   Cycle A

C.1 Salt fog test solution

Prepare the spray solution as described in Clause 5 by dissolving sodium chloride in water to give a concentration of (50±10)g/l .The PH of the solution shall be in the range 6 to 7.

 

C.2 Cycle

Set up the cabinet to perform the following cycle.

 

Step

Time H

Temp

Condition

Notes

1

2

35±2

Salt spray

 

2

4

60±2

Dry20-30%

 

3

2

50±2

Wet95%RH or over

 

4

Go back to step 1

This makes a total cycle time of 8h from step1 to step3

 

Transtition timeie time allowed to reach the temperature and relative humidity specified for a condition after changing to that condition):

From salt spray to drywithin 30min

From dry to wetwithin 150 min

From wet to salt spraywithin 30min

The effect of the salt spray willin principle,be instaneous。

For details of drying-air flow,see 6.4

NOTE  Set points and operational fluctuations can be listed either independently of each other or in the formatset point±operational fluctuations.The set point is the target condition for the sensor when used at the operational control point as programmed by the user.Operational fluctuations are deviations from the indicated set point at the control point indicated by the readout of the calibrated control sensor during equilibrium operation and do not include measurement uncertainty.At the operational control point , the user programmes that exat number . The operational fluctuations specified for that set point do not imply that the user is allowed to programme a set point higher or lower than the exact set point specified.

 

C3 Salt fog depsiton rate

The salt fog deposition rate shall be 1ml/h to 2ml/h,when the salt fog iscollected over a 24h period (see Clause 10)

C 4 Duration

Unless otherwise agreed,repeat the test cycle for 30 cycles(240h),60cycles(240h),90cycles(720h) or 180cycles(1440h)

 

 

 

 

 

 

 

                             Cycle B

C.1 Salt fog test solution

Prepare the spray solution as described in Clause 5 by dissolving sodium chloride in water to give a concentration of (50±10)g/l .The PH of the solution shall be in the range 6 to 7.

 

C.2 Cycle

Set up the cabinet to perform the following cycle.

Step

Time

Temp

Condition

notes

1

24

35±2

Salt fog

 

2

8

40±2

100%RH

Water condensing on test panels

3

16

23±2

50±20%RH

 

4

8

40±2

100%RH

Water condensing on test panels

5

16

23±2

50±20%RH

 

6

8

40±2

100%RH

Water condensing on test panels

7

16

23±2

50±20%RH

 

8

8

40±2

100%RH

Water condensing on test panels

9

16

23±2

50±20%RH

 

10

48

23±2

50±20%RH

 

11

Go back to step 1

This makes the total cycle time 7 days from step1 to step10.

NOTE  Set points and operational fluctuations can be listed either independently of each other or in the formatset point±operational fluctuations.The set point is the target condition for the sensor when used at the operational control point as programmed by the user.Operational fluctuations are deviations from the indicated set point at the control point indicated by the readout of the calibrated control sensor during equilibrium operation and do not include measurement uncertainty.At the operational control point , the user programmes that exat number . The operational fluctuations specified for that set point do not imply that the user is allowed to programme a set point higher or lower than the exact set point specified.

 

 

C3 Salt fog depsiton rate

The salt fog deposition rate shall be 1ml/h to 2ml/h,when the salt fog iscollected over a 24h period (see Clause 10)

C 4 Duration

Unless otherwise agreed,repeat the test cycle for 840 h

 

 

 

 ECS2017_3
 

 

 

 

 

 

                                Cycle C

C.1 Salt fog test solution

Prepare the spray solution as described in Clause 5 by dissolving sodium chloride in water to give a concentration of (0.31±0.01)g/l and (4.1±0.01)g/l respectively  .The PH of the solution shall be in the range 6 to 7.

 

C.2 Cycle

Set up the cabinet to perform the following cycle.

Step

Time

min

Temp

Condition

notes

1

210

30±2

Salt fog

 

2

210

40±2

Dry

Drying-air purge(see 6.4)

3

1470

40±2

75±15%RH

One method of achieving this conditon is to alternate the dry and humid cycles for suitable(short)time periods to keep the RH between the limits specified

4

102

30±2

Dry

Drying-air purge(see 6.4)

5

210

30±2

Salt fog

 

6

378

30±2

90% to 100%RH

Water condensing on test panel

7

180

35±2

Dry

Drying-air purge(see 6.4)

8

120

25±2

Dry

 

9

Go back to step 1

This makes the total cycle time 48h from step1 to step8.

NOTE  Set points and operational fluctuations can be listed either independently of each other or in the formatset point±operational fluctuations.The set point is the target condition for the sensor when used at the operational control point as programmed by the user.Operational fluctuations are deviations from the indicated set point at the control point indicated by the readout of the calibrated control sensor during equilibrium operation and do not include measurement uncertainty.At the operational control point , the user programmes that exat number . The operational fluctuations specified for that set point do not imply that the user is allowed to programme a set point higher or lower than the exact set point specified.

 

 

C3 Salt fog depsiton rate

The salt fog deposition rate shall be 2ml/h to 4ml/h,when the salt fog iscollected over a 24h period (see Clause 10)

 

C 4 Duration

Unless otherwise agreedrepeat the test cycle for1000h

 

 

 

 

                                   Cycle D

C.1 Salt fog test solution

Prepare the spray solution as described in Clause 5 by dissolving sodium chloride in water to give a concentration of (50±10)g/l .The PH of the solution shall be in the range 6 to 7.

 

C.2 Cycle

Set up the cabinet to perform the following cycle.

 

Step

Time H

Temp

Condition

Notes

1

0.5

30±2

Salt spray

 

2

1.5

30±2

Wet:(95±3%RH

 

3

2

50±2

Hot dry

 

4

2

30±2

Warm dry

 

5

Go back to step 1

This makes a total cycle time of 6h from step1 to step4

 

Transtition timeie time allowed to reach the temperature and relative humidity specified for a condition after changing to that condition):

From salt spray to wetwithin 10min

From wet to hot drywithin 15 min

From hot dry to salt warm drywithin 30min

From salt warm dry to salt sprayinstaneous

NOTE  Set points and operational fluctuations can be listed either independently of each other or in the formatset point±operational fluctuations.The set point is the target condition for the sensor when used at the operational control point as programmed by the user.Operational fluctuations are deviations from the indicated set point at the control point indicated by the readout of the calibrated control sensor during equilibrium operation and do not include measurement uncertainty.At the operational control point , the user programmes that exat number . The operational fluctuations specified for that set point do not imply that the user is allowed to programme a set point higher or lower than the exact set point specified.

 

C3 Salt fog depsiton rate

The salt fog deposition rate shall be 1ml/h to 2ml/h,when the salt fog iscollected over a 24h period (see Clause 10)

 

C 4 Duration

Unless otherwise agreed,repeat the test cycle for 28 cycles(168h)

會(huì)員登錄

×

請(qǐng)輸入賬號(hào)

請(qǐng)輸入密碼

=

請(qǐng)輸驗(yàn)證碼

收藏該商鋪

X
該信息已收藏!
標(biāo)簽:
保存成功

(空格分隔,最多3個(gè),單個(gè)標(biāo)簽最多10個(gè)字符)

常用:

提示

X
您的留言已提交成功!我們將在第一時(shí)間回復(fù)您~
撥打電話
在線留言
原来是电影神马在线观看| 疯狂的麦克斯5狂暴女神| 欧美一区二区三区视频在线观看| 久久黄色网址| 欧美日韩在线蜜桃| 国产日韩欧美久久久| 亚洲精品美女久久久久9999| 免费SM羞辱调教视频网站| 娇妻玩4P被三个男人伺候电影| 又爽又黄又高潮视频在线观看网站| 国产黄动漫在线观看| 久久国产精品无码网站| 欧美日韩一区二区三区久久| 亚洲中文字幕最新2021芒果| 聊斋艳谭在线观看| 国产一区二区丝袜在线播放| 日韩人妻中文无码一区二区| 闺房h揉快穿之女配肉袭| CHINESE熟女熟妇1乱| 国产精品亚洲一区二区三区在线 | 在线观看伦理片| 暴虐SM灌浣肠调教| 风韵多水的老熟妇,| 女人与拘猛交高清播放| 作爱激烈叫床视频| 18成禁人视频免费网站| 日本欧美黄色三级网| 亚洲最新在线一区二区三区| 两个人视频全免费高清观看| 久久国产精品免费| 97久久久久人妻精品专区| 麻豆第一区MV免费观看网站| 亚洲欧美在线视频观看免费| 欧美 国产 日韩 精品| 久久精品亚洲视频| 日本精品一区二区三区在线观看| 国语A在线看免费观看视频| 婷婷色香合缴缴情AV第三区| 青草影院天堂男人久久| 韩日一二三级电影免费播放| 久久国产高潮流白浆免费观看|