1 Scope
This procedure is used to determine the resistanceto coating adhesion loss of coated surfaces ofaluminum, plastic, steel, and other substrates when subjected to a wet steam blast similar to thatproduced by vehicle wash equipment.
Note:  Nothing in this standard supersedesapplicable laws and regulations.
Note: In the event of conflict between the English
and domestic language, the English language shall take precedence.
1.1 Purpose. To determine the resistance to coating adhesion loss of coated surfaces of aluminum, plastic, steel, and other substrates when subjected to a wet steam blast similar to that produced by vehicle wash equipment.
1.2 Foreword. Not applicable.
1.3 Applicability. Painted exterior components of vehicle.
2 References
Note: Only the latest approved standards are applicable unless otherwise specified.
2.1 External Standards/Specifications.ISO 2808
2.2 GM Standards/Specifications.
3 Resources
3.1 Facilities. Not applicable.
3.2 Equipment.
3.2.1 Test Equipment and Material.
3.2.1.1 Scribe Tool. A straight-shank tungsten carbide tip, lathe cutting tool or carbide-tipped pencil type tool with tip angle of 60 ± 15 degrees or equivalent.
3.2.1.2 Razor blade.
3.2.1.3 Water Bath. Water bath at 38 ± 2°C temperature with 5 ppm maximum dissolved solids as measured utilizing a suitable dissolved solids meter.

3.2.1.4 Freezer capable of maintaining -29 ± 3°C temperature.
3.2.1.5 Steam generator.
Note: Model 100 (and the earlier Model 60) steam generator (from Atomic Steam Co., 10727 Fendell, Detroit MI 48238) has been found to be satisfactory. Milwaukee 1.27 cm ( 1 / 2 in) globe valve 1151 to 1161, 150 Steam Working Pressure,
300 Water-Oil-Gas,  is  adequate  for  use  in standardization of generator.
3.2.1.5.1 Input Flow of Water. 2.7 L/minute with a deviation less than 5% (3.2.1.5.1.1).
3.2.1.5.1.1 Model 100 Steam Generator. The pumping pressure is directly related to the input flow rate. The pressure needed for the required flow can be determined by measuring the pump pressure and discharge flow rate with the burner off. When the burner is turned on, the required flow rate is obtained by readjusting to the required
pump pressure.
3.2.1.5.2 Nozzle Diameter. 12.5 mm ID within 2% and at least 100 mm long.
3.2.1.5.3 Discharge Dynamic Head. 37.9 kPa within ± 5% measured 25 mm from the nozzle using a 47 mm ID tube. A nondiverging discharge is required for this test (3.2.1.5.3.1 and 3.2.1.5.3.2 and Figure 1).
3.2.1.5.3.1 This is done by placing the tube midstream 25 mm from the nozzle. The tube size must not be varied because the densities and velocities are not uniform throughout the cross section of the discharge stream.
3.2.1.5.3.2 Adjusting the discharge dynamic head may be required. This must be done in such a way that the input flow rate as specified in 3.1.7.1 is maintained. This is done by adjusting the amount of heat transferred to the water. Increasing the heat will cause the input flow rate to change. It must be readjusted. This operation will result in an
increased dynamic pressure. To decrease it, decrease the heat and then adjust the flow (pressure).
3.2.1.6 Face Mask. Full face cover safety mask is required when performing this test.
3.2.1.7 Gloves. Gauntlet-type gloves for protection of hands are required.
3.3 Test Vehicle/Test Piece. Not applicable.
3.4 Test Time. Not applicable.
3.5 Test Required Information. Not applicable.
3.6 Personnel/Skills. Not applicable.
4 Procedure
4.1 Preparation. Not applicable.
4.2 Conditions. Not applicable.
4.2.1 Environmental Conditions. Not applicable.
4.2.2 Test Conditions. Deviations from the requirements of this standard shall have been agreed upon. Such requirements shall be specified on component drawings, test certificates, reports,etc.
4.3 Instructions.
4.3.1 Standardize the Model 100 steam generator.
4.3.1.1 Measure and maintain the input flow at
2.7 L/minute.
4.3.1.1.1 Install a 1.27 cm ( 1 / 2 in) globe valve in the steam line between coil weld assembly and hose nipple, 0.4 cm (5/32 in).
4.3.1.1.2 With burner off, engage pump and adjust globe valve until 2.7 L/minute is obtained.
4.3.1.1.3 Record the tank pressure that is obtained with the 2.7 L/minute flow rate. (This induced back pressure simulates the pressure that steam exerts on the system while the burner is on.)
4.3.1.2 Measure and maintain the mean dynamic head at 37.9 kPa.
4.3.1.2.1 Open globe valve and turn on the burner.
4.3.1.2.2 Allow tank pressure to stabilize before reading the mean dynamic head.
4.3.1.2.3 Adjustments of the dynamic head are to be made by changing the amount of heat transferred to the water at the burner. (The flow rate, as previously specified, must be maintained.)
4.3.2 Measure and record film thickness at proposed test sites per ISO 2808.
4.3.3 Immerse the parts or panels (previously prepared per engineering material specification) in the water immersion tank for 3 h at 38 ± 2°C.Aerate the water by placing a 6.5 ram (0.25 in) ID plastic tube at the bottom of the tank and bubble
air at a rate of 1 bubble per second minimum.Maintain 5 ppm maximum dissolved solids (as NaCl) in the water. Check and record NaCl level using dissolved solids meter.
4.3.4  Remove  the  samples  after  3 h  and immediay place in freezer at -29 ± 3°C.
4.3.5 Prepare a suitable rack to hold the test panels.
4.3.6 Following a 3 h minimum freeze cycle, remove the sample and immediay scribe an X through the coating into the substrate across the entire panel or part where feasible (Figure 2). A razor blade should be used on elastomer substrates. Mount the sample on the test rack.
4.3.7 Within 60 s from freezer removal, direct the steam blast at the scribe lines for a rain of 30 s.Angle of impingement and distance from the panel are important; care must be taken to ensure the dimensions are adhered to as follows: 45 degree
angle at a 50 to 75 mm distance (Figure 3).
4.3.7.1 High pressure wet steam represents a potential safety hazard. Not only is it necessary to secure the samples properly, but full face protection and gloves are required.
4.3.8 Remove from blast, examine, and report any loss of paint adhesion and/or any blushing (i.e., whitening, loss of gloss) and the average distance of paint adhesive loss from the scribe line.

                   
undefined
 

 

                               Figure 1: Measuring the Discharge Dynamic Head

undefined




                                Figure 2: Scribe on Panel

undefined
 

                               Figure 3: Steam Blast Impingement
5 Data
5.1 Calculations. Not applicable.
5.2 Interpretation of Results. Examine sample for any loss of paint adhesion and/or any blushing (i.e., whitening, loss of gloss) and the average distance of paint adhesive loss from the scribe line.
5.3 Test Documentation. Report any loss of paint adhesion and/or any blushing (i.e., whitening, loss of gloss) and the average distance of paint
adhesive loss from the scribe line.
6 Safety
This standard may involve hazardous materials, operations, and equipment. This standard does not propose to address all the safety problems associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and  health  practices  and  determine  the applicability of regulatory limitations prior to use.
7 Notes
7.1 Glossary. Not applicable.
7.2 Acronyms, Abbreviations, and Symbols. Not applicable.
8 Coding System
This standard shall be referenced in other documents, drawings, etc., as follows:
Test to GMW15919
9 Release and Revisions
9.1 Release. This standard originated in May 2008, replacing GM9525P. It was first approved by Materials Engineering in July 2009. It was first published in July 2009.

會(huì)員登錄

×

請(qǐng)輸入賬號(hào)

請(qǐng)輸入密碼

=

請(qǐng)輸驗(yàn)證碼

收藏該商鋪

X
該信息已收藏!
標(biāo)簽:
保存成功

(空格分隔,最多3個(gè),單個(gè)標(biāo)簽最多10個(gè)字符)

常用:

提示

X
您的留言已提交成功!我們將在第一時(shí)間回復(fù)您~
撥打電話
在線留言
BGMBGMBGM毛多多视频| 在线中文字幕亚洲日韩2020 | 交换娇妻系列38部分阅读| 日产国产精品亚洲系列| FREE性中国熟女HD| 神马免费午夜福利剧场| 精品无码国产污污污免费网站| 欧美一区二区三区久久久人妖| 欧美福利二区| 91精品亚洲一区| 亚洲一卡二卡在线| 日本高清一区二区三区不卡免费| а中文在线天堂| 亚洲伊人男人天堂| 亚洲av日韩综合一区二区三区| 精品久久久久久久中文字幕| 国产免费内射又粗又爽密桃视频| 高干病房玩弄少妇护士| 在线亚洲国产日韩| 久久久久久久免费av| 免费韩国美女爽快一级毛片| 日本SM/羞辱/调教/捆绑| 国产成人久久777777| 天堂А√中文最新版地址在线| 欧美激情一区二区亚洲专区| 领导边摸边吃奶边做爽在线观看| 久久久久久久综合日本亚洲| 国产精品久久久久一区二区三区| avtt天堂网Av无码| 久久精品国产亚洲| 日韩在线欧美在线国产在线| 国产成人亚洲精品| 三年片在线观看免费观看大全下载| 日韩精品成人一区二区三区www| 人人妻人人澡人人爽人人精品电影| 自拍日韩亚洲一区在线| 一区二区三区性色福利在线视频| 欧美日韩精品人妻中文| 最近日本字幕完整版2019| 九九九热在线精品免费全部| 陈情令免费观看全集完整版|